A daily water account for each canal reach, checked on the ground and turned into the division's repair list.
Operators and tail-end farmers report what the canal is doing, NaharWatch works out where water is going missing, the Section Officer walks that stretch, and engineers rank what they find in the Department's own repair categories.
Five steps, from a gauge reading to a repair
Today, and with NaharWatch
The "Today" column is drawn from the challenge statement and the Department's 2024 O&M procedure. We'll walk through the real process with a division during discovery.
What the Department asked for, and where to see it
| The challenge asks for | What NaharWatch does | |
|---|---|---|
| Identify and geolocate abnormal conditions or suspected defects | The water account flags the reach losing water. The Section Officer records the defect at a chainage with an in-app photo. Radar after floods adds hints on where to walk. | See it |
| Prioritise maintenance based on condition and risk | A ranked M&R list: severity, area served below the defect, water lost and repeat failures, each with its reasons and SOP category. | See it |
| Mobile field capture and central dashboards | An offline Android app for Section Officers and operators; web screens for AEEs and EEs; WhatsApp, SMS or missed call for tail-end farmers. | See it |
| Retain evidence and status of inspection and corrective action | Each defect keeps its trail: signal, field report, confirmation, work order, before and after photos, closure. Nothing is overwritten. | See it |
| Earlier detection of defects and abnormal water losses | Week-by-week loss for every reach, compared with its own usual figure, and a daily tail-end reply. | See it |
| Reduced inspection burden and avoidable disruption | Walks go to the stretch that is losing water. Routine walks continue for structures on their usual cycle. | See it |
| Analytics for predictive maintenance | A watchlist of reaches whose loss is rising, and a record of every flag's outcome to train a model once enough seasons exist. | See it |
| Combine modelling or GIS data with ground information; actionable alerts | A simple flow model per reach, fed by gauge readings and checked against replies and walks. Every flag becomes a dated task for a named officer. | See it |
How a reach's loss is worked out
Each reach runs between two gauges. Flow at a gauge comes from its water level and the structure's rating table, starting from the design discharge tables and checked with a few current-meter readings in the first season.
Unusual if loss > 3 × the reach's own median of the last 4 weeks, and > 0.1 cumec
| Signal | Rule (starting point) | What happens |
|---|---|---|
| Unexplained loss | As above, on two readings in a row | Walk task for the Section Officer within 2 days; AEE informed |
| Creeping loss | Loss up three weeks running, still below the flag line | Reach goes on the watchlist; walked on the next routine round |
| Tail-end reply | "No water" once, or "low" three days running | Walk task at the outlet and the reach above it |
| Muddy seepage or bank crack | Reported on any walk | Immediate alert to AEE and EE; the field report is marked urgent |
| Radar or optical hint | Ground change beside a bank after a flood | Suggested walk only; never a repair without a field check |
How the M&R list is ranked
| Factor | From | Weight (starting point) |
|---|---|---|
| Severity, 1 to 5 | The Section Officer's report, confirmed by the AEE | 35% |
| Area served below the defect | Command area of every outlet downstream | 30% |
| Water being lost | The water account, where the defect explains a flagged loss | 20% |
| Repeat failure | Past repairs on the same asset | 15% |
These rules and weights are starting points. We'd agree the real ones with the Department's engineers in the first three weeks, and the EE can always move an item with a written reason. The only AI in the system reads the number off a gauge photo; the operator confirms every reading, and a low-confidence read asks them to type it.
From a lost cumec to a line on the M&R list
The M&R year, as the 2024 SOP sets it
The second flow follows section 15 of the Irrigation Department's SOP for Operation and Maintenance of Irrigation Schemes (2024).
Small pieces of hardware, one field app, one set of records
Our live platform runs the same roles, approvals, photo capture and notifications engine. NaharWatch adds the water account, the flag rules and the M&R list. It can be hosted on the State Data Centre or a MeitY-empanelled cloud.
Access by role
Operators see their regulator, Section Officers their section, engineers their sub-division or division. Officers sign in by OTP.
Nothing is overwritten
Every reading, report, confirmation and closure is logged with who, when and which device. A correction makes a new version.
Photos that are hard to fake
Taken only in the app, stamped with location and time, checked for fake locations and duplicates. After photos are matched to the before photo's spot.
Farmers' numbers kept private
Tail-end reporters join with consent and can stop any time. Their numbers are masked in every report (DPDP Act 2023). Canal maps stay with authorised users.
What we'll settle with the Department in the first three weeks
The design rests on the challenge statement, the Department's 2024 O&M procedure and public information on IPMS. These are the points we'll confirm with a pilot division before building the production system.
- Which regulators on the pilot schemes have staff gauges and operators, and where the two level loggers should go.
- Design discharge tables and rating curves for those regulators, and the outlet list with design offtakes.
- What IPMS holds below scheme level, and how NaharWatch reads from and writes to it.
- The DRIMS damage-report fields for irrigation assets.
- Who frames the M&R priority list in a division, and in what format it goes to the CE.
- Which farmers at the last outlets are willing to reply, and on which channel.