Know which canal reach is losing water, before the tail end runs dry.
NaharWatch keeps a daily water account for every canal reach, from a few gauge readings and one reply from a farmer at each last outlet. The Section Officer walks the 1.5 km that matters instead of 12. What they find goes straight onto the division's repair list, in the categories the Department's own O&M procedure uses.
Canals lose water quietly, and the first person to know is the farmer at the end
A flow irrigation scheme in Assam is a weir on a river, a main canal a few kilometres long, some distributaries and dozens of outlets. When a bank starts seeping, an outlet is cut open, or silt builds up after a flood, the canal keeps running. The water just stops reaching the last fields.
Today that is found through inspections, complaints, registers and periodic reports. The Section Officer has a long canal and a few people to walk it. Nobody can say which kilometre to look at first.
Damage that nobody had listed
When the CAG audited 73 completed minor surface schemes, 25 had broken canal embankment walls and 14 had canals blocked with soil, weeds or garbage. 18 were not working at all, 11 of them because of damage and want of repair.
Monthly figures that can't show change
The same audit found monthly reports "with the same value repeated month after month", and water use reported against schemes that weren't running. In the dry season, only 23% of surveyed farmers said they got canal water.
A good procedure, without the data to feed it
The Department's 2024 O&M procedure already asks for prioritised repair lists, geotagged before-and-after photos, and work orders by August. What it doesn't have is a steady stream of findings, by kilometre, to put in them.
Sources: CAG Report No. 1 of 2021 (Government of Assam), performance audit "Outcomes of Minor Surface Irrigation Schemes in Assam" (data to 2019, so dated); Irrigation Department, Assam, SOP for Operation and Maintenance of Irrigation Schemes (2024).
IPMS knows every scheme. NaharWatch shows which reach to walk first.
IPMS, the Department's Irrigation Project Monitoring System (2021), holds the scheme register, geotagged scheme locations, contractor photos and farmer issues from the Khetiyak Bondhu app. The 2024 O&M procedure sets the repair categories, the M&R calendar and the rule for geotagged before-and-after photos. Flood damage goes to ASDMA's DRIMS, as the procedure requires.
The piece that joins them is a daily answer to one question: which reach of which canal is losing water, and a short path from what the walk finds to a line in the M&R proposal.
NaharWatch is designed for small flow schemes that flood every year. It uses the staff gauges already on the canal and one or two level loggers, treats satellite images as hints because wet ground in Assam is mostly paddy, and starts with rules an engineer can check by hand. Every outcome is recorded, so a model can be trained once a few seasons of findings exist.
IPMS details are from the Department's public description. We'd confirm with the Department what it holds below scheme level in the first three weeks.
Three ideas, one system
Find the leak between two gauges.
Every morning in the running season, the operators photograph the staff gauge at their regulator. The app reads the level, the operator confirms it, and NaharWatch turns it into a flow. One or two small level loggers cover the head and the most important cross regulator.
Water in, minus the known offtakes, minus water out, is what the reach lost. Each reach is compared with its own usual loss. A reach that suddenly loses eight times its usual share is flagged, and the trend often shows it creeping up weeks before.
One farmer at each last outlet answers one question a day.
"Did canal water reach your outlet today?" Yes, low, or no. On WhatsApp, SMS or a missed call. It takes a farmer five seconds, and it is the most direct measure of whether the scheme is doing its job.
A "low" or "no" from the tail, together with the water account, tells the Section Officer whether the problem is upstream or at the outlet. Over a season it also gives the Department an honest count of the days water actually reached the tail.
1 Yes, full 2 Yes, but low 3 No water
From a seeping bank to a line in the M&R priority list, with its evidence.
The Section Officer records what they find with photos taken in the app, at a chainage. The Assistant Executive Engineer confirms it and puts it in one of the five repair categories in the Department's 2024 O&M procedure, from "without expenditure" to "beyond repairable condition", and the funding route that goes with it.
The Executive Engineer gets a ranked list that already is the division's M&R priority list, each item with the geotagged photos, history and water lost that an estimate needs. It is ready the week the budget is communicated.
- Geotagged before photos (3), taken in the app
- Chainage, asset ID, aqueduct AQ-01 nearby
- Past repairs: pitching, 2019
- Water lost: 0.37 cumec, rising for 3 weeks
- Entry in IPMS: goes in tonight's batch
Built around the Department's existing systems
- IPMS stays the scheme registerSchemes come from IPMS. Damage entries and their photos go back to it, as the O&M procedure asks.
- Khetiyak Bondhu issues land on the right reachFarmer reports about a canal or outlet are pulled in and placed next to the water account.
- Flood damage goes the usual wayDamage found on a walk is prepared in the shape a DRIMS report needs, for SDRF or SOPD-FDR works.
- The 2024 O&M procedure, as writtenRoles, the five repair categories, funding routes and the M&R calendar are taken from it unchanged.
Satellite images are used as hints, mainly radar after a flood, to choose which reaches to walk first. A hint becomes a repair only after a field check.
Try the working prototype
Choose a role. All four share the same records, so a farmer's reply in the morning reaches the Executive Engineer's repair list by noon.